The project involved a complete demolition of the existing space down to the structure, including the removal of the exterior storefront. This enabled the construction of a new entrance and the installation of a 20-foot-wide overhead door for direct access to Locust Avenue. The interior rebuild featured new offices, a conference room for staff, color-changing LED lights, two large LED TV walls, a custom millwork bench, and wings. Extensive coordination with the architect was required to ensure the design intent aligned with the existing conditions of the space.
Project Details
Locations: Des Moines, Iowa
Project Type: Corporate Office
Faces Behind the Project:
Tyler Kumm
Tommy Hisler
Brandon Schulte